Comparison · Modular vs traditional

Container data centre or a new server room?

A modular container data centre is running in 12 to 14 weeks. A conventional server room usually takes 12 to 24 months. Here is how the two compare.

3D cutaway of a modular container data centre compared with a traditional server room

Comparison

Side by side

Container data centreNew server room
Time to operation12 to 14 weeks from orderTypically 12 to 24 months
PermitsSlab and connections only, no building permit for a data hallBuilding or refurbishment permits
ContractorsOne contract and one point of responsibilityBuilder, electrical, mechanical, fire and IT contractors
Cost predictabilityScope priced per project before orderChanges and overruns during construction
TestingLoad tested in the factory before deliveryOnly tested once construction is complete
RelocationDisconnect, lift and move to a new slabFixed to the building
ScalabilityUPS in 30 kW steps, or add a second unitLimited by the room, power and cooling
Rack density10 to 20 kW per cabinet, more with rear door coolingOlder rooms often 3 to 5 kW per rack

Honest answer

When each option makes sense

Choose a container when

Time matters, there is no suitable room, the data must stay on site, the site may move, or you need a second site for recovery.

A server room can still fit when

You already have a suitable room with spare power and cooling, the load is small, and the building will stay in use for many years.

Colocation or cloud fit when

The data and applications can leave your site, and network dependency is acceptable for your operation.

FAQ

Container vs server room: questions

Not answered here? Ask us directly. We reply within a few hours.

Request a budget price

Is a container data centre cheaper than a server room?

It depends on the site. With no building work and a short time on site, the total is often competitive. The bigger difference is predictability: the scope is priced before order and tested before delivery.

Does a container need a building permit?

Usually only the slab and the connections need approval, not a building for a data hall. Local rules vary by country and site.

Can it replace our existing server room?

Yes. The reference unit replaced an organisation's primary IT facility, and the full migration took one weekend.

Budget price

Request a budget price

Three figures are enough to start: IT load, site and date. We reply within a few hours, with a budget price within 48 hours.

48hBudget price and an outline configuration. Specification and drawings follow once the scope is agreed.
Reply within hours · budget price within 48 hours
Request a budget price